December 8, 201510 yr Basement developement project where I installed in-floor warming and tile in bathroom. Most of my customers allow me to design and install the tile paterns to my decision. This one I did last spring. [gallery640x480] [album]182[/album] [/gallery]
December 8, 201510 yr Author Master bathroom project had mildew and the jet tub was leaking causing homeowners to not use. Removed tub, tile and mildew. Built shower wall, installed shower tray, waterproofing membrane and tile. Sorry no finished project pics taken. [gallery640x480] [album]183[/album] [/gallery]
December 9, 201510 yr Author [gallery640x480] [album]185[/album] [/gallery] [gallery640x480] [album]186[/album] [/gallery]
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.